Jump to content

mrnashville

Members
  • Content Count

    1
  • Joined

  • Last visited

  1. I had a home built with a detached garage that was an upgrade with plans that called for 20x20 with a pull down and 4ft high ceilings and a light. After closing an issue of water leaking in the garage and after 6 months and mold starting to grow all over the drywall the builder came out to fix the issue and just keeps putting band aids on the issue. I was told they built it based on the drawings that were signed off on. So I measured the 19x18.75 with 2 ft of attic space with no light.... I sent a text to the builder and NO REPLY.... What should I do?
×
×
  • Create New...